Add CI status check to Loop Iteration for Phase 7 #9

Merged
ReadyPlayerNaN merged 1 commit from issue-8-loop-iteration-ci-status into main 2026-03-19 11:53:10 +00:00

Summary

  • Updates Loop Iteration step 1 to mention CI/check status for Phase 7 issues
  • Aligns the summary with the existing Phase 7 step 3 (CI failure handling)

Closes #8

Test plan

  • Verify Loop Iteration section now mentions CI for Phase 7
  • Verify consistency with Phase 7 step 3
## Summary - Updates Loop Iteration step 1 to mention CI/check status for Phase 7 issues - Aligns the summary with the existing Phase 7 step 3 (CI failure handling) Closes #8 ## Test plan - [ ] Verify Loop Iteration section now mentions CI for Phase 7 - [ ] Verify consistency with Phase 7 step 3
The Loop Iteration summary now mentions CI/check status alongside review
comments for Phase 7 issues, aligning it with the existing Phase 7 step 3
that handles CI failures.

Closes #8

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
zak.pub/tantalus!9
No description provided.